Unpacking - usi CSL2700 Owner's Manual

Roll laminator
Hide thumbs Also See for CSL2700:
Table of Contents

Advertisement

Photo 7-1
Photo 7-2
7
UnPacKInG YoUr lamInator
Your laminator comes packed in one carton. It
contains (1) laminator, (1) heat guard, (1) top supply
mandrel, (1) bottom supply mandrel, (1) threading
board, (1) feed table with guide, and this operation
and maintenance manual. (See diagram page 5)
First, open the box. Using two people, carefully lift
the laminator from the carton by grasping the side
housings and lifting. do not lift by the upper idler
bar or supply mandrel. these are not weight bearing
parts and can cause damage to the machine.
For shipping purposes, white plastic tie straps are
used to hold the power cord, heat shoes, and acces-
sories in place. these straps are approximately 1/8"
wide and should be carefully cut and removed prior
to set up.
Be sure to save the shipping carton...
Should your laminator ever need to be returned for
service, this carton ensures safe transit.
Your new laminator comes pre-loaded and ready to
run. Install the feed table and heat guard as shown
on page 13. Plug the machine in and turn the heat
switch to the "on" position and allow to heat for
approximately 15 minutes. check the heat setting
and adjust if necessary as shown on page 11.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents