Unpacking - usi CSL2700 Owner's Manual

Hide thumbs Also See for CSL2700:
Table of Contents

Advertisement

Photo 8-1
Photo 8-2
UnPacKInG YoUr lamInator
Your laminator comes packed in one carton. It
contains (1) laminator, (1) heat guard, (1) top
supply mandrel, (1) bottom supply mandrel, (1)
threading board, (1) feed table with guide, and
this operation and maintenance manual. (See
diagram page 6)
First, open the box. Using two people, carefully
lift the laminator from the carton by grasping
the side housings and lifting. do not lift by the
upper idler bar or supply mandrel. these are
not weight bearing parts and can cause dam-
age to the machine.
For shipping purposes, white plastic tie straps
are used to hold the power cord, heat shoes,
and accessories in place. these straps are
approximately 1/8" wide and should be care-
fully cut and removed prior to set up.
Be sure to save the shipping carton...
Should your laminator ever need to be returned
for service, this carton ensures safe transit.
You new laminator comes ready to run. load
the laminating film as shown on page 9. Install
the feed table and heat guard as shown on
page 13. Plug the machine in and turn the heat
switch to the "on" position and allow to heat for
approximately 15 minutes.
after 15 minutes of heating time, set the motor
drive Switch to the "Forward" position and
allow the rubber rollers to rotate 1/2 turn. Set
the motor drive Switch to the "off" position and
allow the machine to heat an additional 5
minutes before use. check the heat setting and
adjust if necessary as shown on page 12.
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents