Sony HVR-Z7J Service Manual page 283

Digital hd video camera recorder
Hide thumbs Also See for HVR-Z7J:
Table of Contents

Advertisement

3-18. TG6 Block Ass'y
1. Removal procedure
1) Remove the extension spring (return TG6) 1.
2) Remove the TG6 block ass'y 2.
2 TG6 block ass'y
HVR-Z7J/Z7U/Z7N/Z7E/Z7P/Z7C
Groove of mechanism
chassis
TG6 hole
TG6 lever
TG6 shaft
2. Attachment procedure
1) Apply grease inside the boss of the TG6 shaft hole.
Amount of grease: A ball of grease of 1.0 mm diameter.
Re-application of grease to the already-greased-point is not
necessary.
2) Insert the TG6 shaft TG6 block ass'y 2 in to the TG6 shaft
hole. At the same time, insert the TG6 shaft lever into the groove
of the LS chassis and that of the mechanism chassis.
3) Engage the extension spring (return TG6) 1 on the hook A
and hole of the TG6.
TG6 block ass'y
Key Points
in Re-assembling
TG6 block ass'y
Groove of LS chassis
Hook must face
downward.
1 Extension spring
(return TG6)
Hook facing
outside.
Hook A
6-99
Apply grease
Points to be noted
Apply grease inside the boss of the
TG6 pivot shaft boss.
Amount of grease: A ball of grease
of 1.0 mm diameter.
(Re-application of grease to the
already-greased-point is not necessary.)
TG6 pivot shaft boss

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hvr-z7uHvr-z7nHvr-z7pHvr-z7cHvr-z7e

Table of Contents