Programming A New Cycle - Dexter Laundry T-900 Operator's Manual

Industrial washer model t-900/950 on-premise n-series control
Table of Contents

Advertisement

3.1.8 Program another bath.
If desired, repeat steps 3.1.5 through 3.1.7 to program another
bath. Otherwise, continue to the next step.
3.1.9 Program another cycle.
To program a different cycle when any of the nine bath LEDs are
illuminated, press the "EXIT" button. The "SELECT CYCLE" LED will
immediately illuminate. The programming changes made prior to
the program exit are retained and the cycle is updated.
NOTE: When the "FINAL RINSE" bath programming is complete,
the cycle programming is also complete and the "SELECT CYCLE"
LED will immediately illuminate. Another cycle can be programmed.
If desired, repeat steps 3.1.3 through 3.1.8 to program another
cycle. Otherwise, continue to the next step to end programming.
3.1.10 End programming mode.
When the "SELECT CYCLE" LED is illuminated, turn the key to the
"RUN" position. The "PROGRAM MODE" LED will turn off.
NOTE: The Wash Cycle programming mode will automatically exit and
return to the Idle mode if no buttons are pressed for one minute.
3.2

PROGRAMMING A NEW CYCLE

The instructions for entering a new cycle are the same as the instructions
in section 3.1. To program a new cycle, an existing cycle number
between 1 and 30 must be overridden with a custom program. Cycle 31
cannot be reprogrammed. Only the cycle baths required need to be
programmed. Any baths, except FINAL RINSE, can be skipped by
entering a "00" time value in the Cycle Time for each unused bath.
8514-244-001 REV PR page 17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T-950

Table of Contents