Mitsubishi Electric GOT 1000 Connection Manual page 47

Graphic operation terminal
Hide thumbs Also See for GOT 1000:
Table of Contents

Advertisement

(2) Operational settings
Item
Communication date code
IP address
*1
Initial timing
Send frame setting
TCP Existence confirmation setting
*1
Because the port No. 5551 is fixed, the GOT operates as follows, regardless of the setting for the item.
• Communication date code
• Initial timing
When changing Ethernet parameter
After writing the Ethernet parameter to the programmable controller CPU, turn off
and then on, or reset the programmable controller CPU.
*1
: [Binary code]
: [Always wait for OPEN] (Communications are enabled while the program-
mable controller CPU stops.)
Setting
(Use default value.)
192.168.0.19
(Use default value.)
: Required
: Set if necessary
2.3 Programmable Controller Settings
1
2
Setting
(with GOT connected)
: Not required
2 - 25

Advertisement

Table of Contents
loading

Table of Contents