Mitsubishi Electric GOT 1000 Connection Manual page 21

Graphic operation terminal
Hide thumbs Also See for GOT 1000:
Table of Contents

Advertisement

(2) Installing a GOT
Connecting with a PLC
For the operations from installing a GOT to communicating with a PLC CPU, refer to the following
manuals.
Purpose
Confirming part names and
specifications of the GOT
Confirming the GOT installation method
Confirming the mounting method for
communication units or option devices
Confirming the PLC connection method
Confirming the utility operation method
Confirming error codes (system alarm)
displayed on GOT
(3) Other manuals
The following manuals are also available.
The following manuals are stored in the GT Works2/GT Designer2 in PDF format.
(a) GOT1000 Series Extended/Option Functions Manual
Describes how to use the ladder monitoring function, system monitor function and list editor for
A/F, network monitor function, Q motion monitor function, servo amplifier monitor function,
CNC monitor function, intelligent module monitor function.
(b) GOT1000 Series Gateway Functions Manual
Describes how to use the gateway function.
(c) GT Simulator2 Version
Describes how to simulate the created project data with the GT Simulator2.
(d) GT Converter2 Version
Describes how to use the GT Converter2.
(e) GOT1000 Series MES Interface Function Manual
Describes how to use the MES Interface Function.
(Included)
GT16 General Description
GT15 General Description
GT11 General Description
Overview
Overview
Operating Manual
Operating Manual
GT16 User's Manual
GOT1000 Series
GT15 User's Manual
Connection Manual
GT11 User's Manual
Detailed
Detailed
Detailed
Overview
Detailed
Detailed
Detailed
1
2
1 - 3

Advertisement

Table of Contents
loading

Table of Contents