Burner And Ignition System; Pre-Start Check List; Safety Checks - Harsco Industrial 1004905923 Installation & Owner's Manual

Modu-fire forced draft gas-fired boiler
Table of Contents

Advertisement

Consult your water conditioning or chemical treatment supplier for analysis and recommendations. Employing a
conscientious and competently administered program with emphasis on good maintenance practices as outlined
by your water treatment specialist is recommended.
If water/glycol is to be used in the system, the customer should perform a hazard analysis to determine proper
use and disposal.
3.8
B
I
URNER AND
GNITION
3.8.1
Inspection
Inspect the burner to be sure nothing was damaged or knocked loose during shipment. Inspect the main gas train
and ignition assembly to be sure they were not damaged during shipment or installation. Inspect the ignition wire
and igniter to be sure they were not damaged nor cracked.
Check all gas unions for tightness.
3.9
P
-S
C
RE
TART
HECK
Before attempting to start the boiler, make sure the following items have been completed.
1. Flue gas from the boiler is properly vented. (See section 3.5)
2. Gas connection has been made, pressure tested for leakage, and the line purged of air. (See section 3.6)
3. Water connections are complete, and the boiler and system have been filled and purged of air. (See section
3.7)
4. The boiler must be connected to a 240 volt / 60 Hz / 1 Ph power source with proper polarity, a dedicated
machinery ground, and provided with a disconnect having adequate overload protection. (See section 3.4)
5. Combustion air openings are not obstructed in any way and have adequate capacity. (See section 3.5)
6. The boiler is located with the proper clearances as shown in this manual. (See Section 3.3.3)
7. Relief valves have been properly piped to floor drains. (See section 3.7)
8. There are no flammable liquids, materials or hazardous fumes present in the environment.
9. Remove/account for all tools and parts.
10. All panels and parts should be properly installed.
3.10 S
C
AFETY
HECKS
The following checks of safety systems must be made before putting the boiler into normal operation.
Before firing the boiler refer to Sections 4.1 and 4.2 for information on the use of the controls, lighting, and shut-
down procedures.
described below.
S
YSTEM
L
IST
Never attempt to operate a boiler that has failed to pass all the safety checks
®
MODU-FIRE
Forced Draft Gas-Fired Boiler 2500-3000
26