Removing The Heat Exchanger; After All Repairs Or Maintenance; Sequence Of Operation - Harsco Industrial 1004905923 Installation & Owner's Manual

Modu-fire forced draft gas-fired boiler
Table of Contents

Advertisement

9. Check the gray grafoil gaskets around the burner flange for cracking. Replace if necessary. Replace the
red silicone gasket on the heat exchanger head.
10. Clean the burner to remove any soot or foreign material that may have accumulated. Blow the burner with
compressed air or wash off (do not scrub or use wire brush).
11. Use a soft, clean cloth to remove accumulated contaminants from the UV detector/scanner glass
envelope.
12. Before re-installing the burner, check the cleanliness of the heat exchanger and the condition of the
combustion chamber. If corrosion or leaks are noticed, please call for service.
13. Re-install components in the reverse order of removal. Be sure to reinstall all gaskets, O-rings and
electrical connections. Be sure the gas valve flange and O-ring is assembled correctly to prevent gas
leaks.
14. Reinstall all covers.
15. Fire Test the boiler and use a combustion analyzer to ensure that the fuel/air ratio is set correctly. If
adjustment is required, refer to section 3.14.1.
5.3
R
H
EMOVING THE
heat exchanger should be performed only by knowledgeable and experienced personnel.
5.4
A
A
R
FTER
LL
EPAIRS OR
1. Follow "Pre-Start Check List" (Section 3.10) and all "Safety Checks" (Section 3.11) and verify proper
operation.
2. Fire the Boiler and perform combustion check.
3. Adjust gas flow if necessary. (See "Gas Pressure Adjustment", Section 3.14.1)
5.5
S
O
EQUENCE OF
PERATION
1. In order for the boiler to start, the following limits must be satisfied:
a) Water flow switch
b) High & low gas pressure switches
c) High temperature limit
d) High back pressure switch
e) High stack temperature switch
2. When the Boiler On/Off switch is turned on, power is provided through a circuit breaker to the boiler control
and the combustion blower.
3. If the high gas, low gas or low water level control is open, the boiler control locks out and displays an error.
4. When the water temperature is below the boiler control setpoint minus the hysteresis (On Differential), a heat
request is generated.
5. Provided all limits are made, the boiler will attempt to start.
E
EAT
XCHANGER
Heat Exchanger is heavy and may cause injury if improperly handled. Removal of the
M
AINTENANCE
®
MODU-FIRE
Forced Draft Gas-Fired Boiler 2500-3000
36