4.7 Pump Out
This function gathers the refrigerant to other ODU and IDU.
Use this function in case of compressor failure, ODU parts defect, leakage.
Close liquid SVC V/V of each unit.
Open gas SVC V/V of each unit.
Close high/low pressure common pipe
of corresponding ODU
Main PCB
Power reset after Dip switch setting of ODU
SW01B
General case: No.10,14 on
SW02B
Inv Compressor failure:No.3,10,14 on
Main PCB
Press the black button
SW01V
All IDU heating operation
Satisfy low pressure target?
Note 2)
Low pressure > 229 kpa(33.2 psi)
Main PCB
SW02V
SW01V
Power reset after Dip switch No.(3), 10, 14 off
[Note]
If
is displayed, close gas SVC V/V of all ODU immediately.
If low pressure descends below 229 kPa (33.2 psi), the system turns off automatically. Close gas SVC V/V immediately.
Caution
1.Use pump out function within guaranteed temperature range
IDU : 10°C(50°F) ~ 30°C(86°F)
ODU : 5°C(41°F) ~ 40°C(104°F)
2. Make certain that IDU doesn't run with thermo off mode during operation
3. Pump out function takes 2~5 min. after compressor start.
Make certain that IDU doesn't run with thermo off mode during operation
(in case low pressure doesn't go down)
4. Press black+red button during operation to end pump out.(IDU,ODU off)
Copyright ©2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Yes
Pump out completed
Press the black button
IDU, ODU OFF
No
Note 1)
- 41 -
Function
ODU SVC V/V Setting
Close
Open
Ball Valve(Liquid Pipe)
Ball Valve(Gas Pipe)
ODU SVC V/V Setting
Close
Close
Ball Valve(Liquid Pipe)
Ball Valve(Gas Pipe)
LGE Internal Use Only
Elbow
Elbow