Flow Chart - LG Single A Svc Manual

Single "a"-inverter type
Hide thumbs Also See for Single A:
Table of Contents

Advertisement

Part 3 Control logic

8.4 Flow Chart

• Cooling
Tdsh<20˚C(Option)
Dis superheating
T
<20˚C
dsh
Close LEV
Copyright ©2009 LG Electronics. Inc. All right reserved.
Only for training and service purposes
Power ON
Initialization
(Duration 90 sec)
Compressor ON
Outdoor Fan ON
Starting control
(Duration 240 sec)
On-time control
(Duration continues)
Check Dis superheating
temp.(Tdsh)
control
(T
)
dsh
≥0˚C(Option)
T
dsh
Check T
in
Back to
Main Control
Power Reset
LEV
Fully close
(set 0,-200 pulse, can
hear knocking sound)
Fully Open
Standard Initial set
pulse open
Step control (every
1 min response time)
Catch up the stagnation
Step control (every
2 min response time)
Super heat control
(T
T
<2˚C
sh
Open LEV
- 48 -
Tdsh>20˚C(Option)
= T
–T
)
sh
out
in
≥2˚C(Option)
T
sh
Check T
in
Close LEV
LGE Internal Use Only

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents