Water Piping Work; Installation Procedure; Matters Of Attention; Antifreeze - Gree HLR35SM/NaA-M Service Manual

Modular mini chiller
Table of Contents

Advertisement

MODULAR MINI CHILLER

2 WATER PIPING WORK

2.1 Installation Procedure

For all guidelines, instructions and specifications regarding refrigerant pipework between the
indoor unit and the outdoor unit. Please refer to the outdoor unit installation manual.
The units are equipped with a water inlet and water outlet for connection to a water circuit must
be provided by a licensed technician and must comply with all relevant national regulations.

2.2 Matters of Attention

Air vents must be provided at all high points of the system. The vents should be located at
points which are easily accessible for servicing. An automatic air purge should be used. Check
the valve is not tightened too much so that automatic release of air in the water circuit remains
possible.

2.3 Antifreeze

% by Weight
Freezing Point
Ambient
Temperature
Cooling
Capacity
Correction Factor
Water
Flow
Correction
Factor
Pressure Drop Correction
Factor

3 ELECTRIC WIRING WORK

3.1 Wiring Principle

POWER SUPPLY — The electrical characteristics of the available power supply must agree
with the unit nameplate rating. Supply voltage must be within the limits shown. See 3.3 for
electrical and configuration data. FIELD POWER CONNECTIONS — All power wiring must
comply with applicable local and national codes. Install field-supplied, branch circuit fused
disconnect(s) of a type that can be locked off or open. Disconnect(s) must be located within
sight and readily accessible.
0
12
0(32)
-5(23)
8.3(47)
3.3(38)
1.0
0.985
1.0
1.02
1.0
1.07
22
30
-10(14)
-15(5)
-1.7(29)
-6.7(20)
0.980
0.974
1.04
1.075
1.11
1.18
INSTALLATION
36
41
-20(-4)
-30(-22)
-11.7(11)
-16.7(2)
0.970
0.965
1.11
1.14
1.22
1.24
31