3.3 Piping Work Requirements

There should be no fall among outdoor modules. Refer to the table below for piping work
requirements.
Outer Diameter mm(inch)
Φ6.35(1/4)
Φ9.52(3/8)
Φ12.7(1/2)
Φ15.9(5/8)
Φ19.05(3/4)
Φ22.2(7/8)
Φ28.6(1-1/8)
Φ34.9(1-3/8)
Φ41.3(1-5/8)
Fig.3.2.10
Fig.3.2.11
R410A Refrigerant System
Wall Thickness mm(inch)
≥0.8(1/32)
≥0.8(1/32)
≥0.8(1/32)
≥1.0(3/76)
≥1.0(3/76)
≥1.2(1/21)
≥1.2(1/21)
≥1.3(2/39)
≥1.5(1/17)
8
Type
O
O
O
O
1/2H
1/2H
1/2H
1/2H
1/2H