SI-22 User Manual Table of Contents Setting up your system ......................3 Care during use ........................4 Acknowledgments ....................... 5 CHAPTER 1 INTRODUCTION ..................6 1.1 General Description ....................... 6 1.2 System Specifications..................... 7 1.2.2 Dimensions ......................... 8 1.2.3 I/O View ........................9 1.3 Exploded View of the SI-22 Assembly .................
SI-22 User Manual Safety Information Your SI-22 is designed and tested to meet the latest standards of safety for information technology equipment. However, to ensure your safety, it is important that you read the following safety instructions Setting up your system ...
SI-22 User Manual Care during use Do not walk on the power cord or allow anything to rest on it. Do not spill water or any other liquids on your system. When the system is turned off, a small amount of electrical current still flows. Always unplug all power, and network cables from the power outlets before cleaning the system.
SI-22 User Manual CHAPTER 1 INTRODUCTION 1.1 General Description The “Signature Book™” SI-22 is a professional fanless digital signage system powered by the new AMD Embedded new generation G-Series quad-core APU with DASH compliance for remote control, and compact & slim design. It supports 2x HDMI, 1x RJ45 for LAN, 1x RJ45 for RS232, 1x USB2.0 and 2x USB3.0 ports giving a great selection for data communication in display applications.
SI-22 User Manual 1.3 Exploded View of the SI-22 Assembly 1.3.1 Parts Description Part No. Description Part No. Description IB922 motherboard SI-22 Base SI-22 Cover SI-22 heatsink 1.4 Packing List Item No. Description Driver CD Power adaptor Power Cord...
SI-22 User Manual 1.5 HARDWARE INSTALLATION 1.5.1 Installing the Wireless Module 1. Remove the six screws on the sides that are used to secure the white cover to the chassis. Once all the screws are removed, from the side, push the cover forward to remove it.
SI-22 User Manual 1.5.2 Installing the mSATA Module 1. Remove the six screws on the sides that are used to secure the white cover to the chassis. Once all the screws are removed, from the side, push the cover forward to remove it.
SI-22 User Manual CHAPTER 2 MOTHERBOARD INTRODUCTION 2.1 Installing the Memory The IB922 board supports one DDR3 memory socket J6 for a maximum total memory of 8GB DDR3 memory type. Installing and Removing Memory Modules To install the DDR3 modules, locate the memory slot on the board and perform the following steps: 1.
SI-22 User Manual 2.3 Connectors on IB922 SW1: Power On Button CN1: Gigabit LAN (RTL8111DP) CN2: COM1/RS232 Serial Port (RJ45 TYPE) Signal Name Pin # Pin # Signal Name RTS, Request to send Data terminal ready TXD, Transmit data GND, ground GND, ground RXD, Receive data DSR, Data set ready...
SI-22 User Manual CHAPTER 3 BIOS SETUP This chapter describes the different settings available in the BIOS that comes with the board. The topics covered in this chapter are as follows: 3.1 BIOS Introduction The BIOS (Basic Input/Output System) installed in your computer system’s ROM provides critical low-level support for a standard device such as disk drives, serial ports and parallel ports.
Page 26
SI-22 User Manual CPU Configuration This section shows the CPU configuration parameters. Aptio Setup Utility Main Advanced Chipset Boot Security Save & Exit CPU Configuration Module Version: 4.6.5.1 TrinityPI 012 AGESA Version: 1.0.0.3 → ← Select Screen PSS Support Enable ↑↓...
Page 28
SI-22 User Manual USB Configuration Aptio Setup Utility Main Advanced Chipset Boot Security Save & Exit USB Configuration USB Devices: 1 Keyboard, 1 Mouse Legacy USB Support Enabled USB3.0 Support Enabled XHCI Hand-off Enabled → ← Select Screen EHCI Hand-off Enabled ↑↓...
Page 30
SI-22 User Manual F81866 H/W Monitor Aptio Setup Utility Main Advanced Chipset Boot Security Save & Exit PC Health Status System Smart Fan Function Disabled CPU Smart Fan Function Disabled SYS_Fan2 smart fan control Disabled SYS Temp +35 C → ← Select Screen CPU Temp +52 C ↑↓...
Page 32
SI-22 User Manual Aptio Setup Utility Main Advanced Chipset Boot Security Save & Exit OnChip SATA Channel Enabled → ←Select Screen OnChip SATA Type Native iDE ↑↓ Select Item OnChip iDE mode Legacy mode Enter: Select +- Change Field SATA IDE Combined Mode Enabled F1: General Help F2: Previous Values...
Page 38
SI-22 User Manual Save & Exit Settings Aptio Setup Utility Main Advanced Chipset Boot Security Save & Exit Save Changes and Exit Discard Changes and Exit Save Changes and Reset Discard Changes and Reset Save Options Save Changes Discard Changes →...
Page 40
SI-22 User Manual 3. When the welcome screen appears, click Next. 4. Select the language you would like to be displayed and click Next. 5. Click Install to continue the installation process.
SI-22 User Manual 4.3 LAN Drivers Installation 1. Insert the CD that comes with the board. 2. Click LAN Card and then Realtek RTL8111G LAN Controller Drivers. 3. In the Welcome screen, click Next. 4. In the License Agreement screen, click I accept the terms in license agreement and Next to accept the software license agreement and proceed with the installation process.
SI-22 User Manual Wall Mounting Requirements Note: Before mounting the system on wall, ensure that you are following all applicable building and electric codes. When mounting, ensure that you have enough room for power and signal cable routing. And have good ventilation for power adapter. The method of mounting must be able to support weight of the SI-22 plus the suspend weight of all the cables to be attached to the system.