(2) Detaching and refitting the operation panel
Procedure
1. Release two hooks and then remove
the operation panel.
2. Remove the FFC from connector.
3. Check or replace the operation panel
and refit all the removed parts.
Hook
Operation panel
1-5-48
Hook
Operation panel
FFC
Figure 1-5-72
2KT/2KV
Connector