(6) Detaching and refitting the operation PWB

Procedure
1. Open the top cover.
2. Remove the JAM processing procedure
sheet..
3. Remove three screws.
Figure 1-5-114
Figure 1-5-115
1-5-62
2P7/2R0/3PN
Top cover
Screw
Screw
Screw
Top cover
JAM processing
procedure sheet