Preparing The Opening And Fi Xing - Dometic HB 2500 Operation, Maintenance And Installation Manual

Dometic hb 2500 heat pump operating instructions
Table of Contents

Advertisement

2 Information on installation
2.3. Preparing the opening and fi xing
GB
HB2500
710
609
267.5
16
Ø 20
Ø 55
123
187
3 0 m
m
2 0 0 m
m
To install the machine it is necessary to create openings in the fl oor.
The openings in the fl oor of the vehicle must be accessible and, there-
fore, must not be covered by parts of the chassis frame behind or the
like.
These openings must not be reached by splashes from the wheels; fi t
a splash guard or something similar if necessary.
Take care to leave a gap of at least 30mm between the machine and
the adjacent walls. Secure the machine to the fl oor using the kit pro-
vided.
The machine must preferably be installed level. Maximum an-
gle 10° to prevent condensation coming out.
Before making the holes, always check there are no cables, gas
pipes, parts of the chassis frame or the like underneath or hid-
den. Seal the machined surfaces of the openings in the fl oor with
water-repellent products.
16
m
3 0 m
Operating instructions for users

Advertisement

Table of Contents
loading

Table of Contents