Leica DNA03 User Manual page 58

Hide thumbs Also See for DNA03:
Table of Contents

Advertisement

The point numbers are not automatically
incremented in this dialog. If required, the
numbers must be incremented manually.
BF line levelling :
Press<REC> to save the backsight and to
switch to foresight. Now measure the foresight
and save it with <REC>. This sequence
corresponds tot the BE line levelling procedure.
Point-to-point and staking out of heights,
height differences and distances:
Before measuring a foresight, it is possible to
measure point-to-point or stakeout points.
The measurements are saved in the internal
memory in current job. If not job was created, then a
"DEFAULT" job is automatically created.
In the Start dialog of "Meas & Rec" set whether
every measurement (every measurement triggered
with the red measuring button) should be saved or
only the last measurement made before pressing
<REC>.
If the data back up settings in the menu is set to
"RS232" , then the data are transferred to the imter-
face in GSI-format and not saved internally. Backing
up to the RS232 interface triggers a warning to the
user.
In the back and foresight displays a single
point can be measured as often as desired
(PtID is not incremented). The observer has to
switch to the next sight, like e.g. between back and
foresights.
Before measuring the next sight make sure
you have moved to the next empty data
field.
58

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dna10

Table of Contents