Honda VT750DC ACE Service Interval And Recommended Maintenance Manual page 44

Hide thumbs Also See for VT750DC ACE:
Table of Contents

Advertisement

Honda VT750DC ACE 
Installation:
1. Position the wheel between the swing arms and loosely install the chain over the rear sprocket, then slide the
axle (from the left side) through the swing arm, side collar, wheel hub, other side collar and opposite swing
arm. (NOTE: You might find it easier to have help. Also, I always preferred holding the wheel against the left
side collar and left swing arm until the axle was into the wheel hub, then position the right side collar before
sliding the axle the rest of the way.)
2. Install the axle nut, but don't tighten it yet;
3. Connect the brake stopper arm to the brake panel with bolt, seat washer, washer and nut. Tighten the nut to
14 lb.ft.;
4. Install the NEW cotter pin. Connect the brake rod to the brake arm;
5. Adjust the drive chain ( Ref: Task 01 - Drive Chain );
6. Adjust the rear brake free play ( Ref: Task 04 - Brake System );
7. Tighten the axle nut to 69 lb.ft..
44 
 
7. Remove the axle nut, right side collar and rear axle
(note the positions of the two side collars for
reassembly);
8. Slide the rear wheel forward and remove the chain
from the rear sprocket;
9. Remove the rear wheel.
 
Front Wheel Removal:
1. Raise and support the motorcycle using a lift or
jack;
2. Remove the screw and speedometer cable from the
speedometer gear.
Note: VT750C and VT750CD/CD2 (1998-2000)
 
  Service Interval and Recommended Maintenance Manual 

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents