INSTALLATION
NOTE The EBMs must be installed below the UPS as shown in Figure 6.
5.
6.
7.

Tower Setup

The tower setup varies depending on the number of cabinets you are
installing:
1.
2.
3.
22
EATON Powerware
Slide the UPS and any optional EBMs into the rack.
Secure the cabinets to the rack according to the rail kit instructions.
Continue to "Installing the UPS" on page 25 to complete the
installation.
UPS
Optional
EBMs
Figure 6. Rack-Mount UPS with EBMs
For one cabinet, the pedestals must be installed. Continue to Step 2.
For two or more cabinets, the joining brackets must be installed. Skip
to Step 6.
Place the UPS cabinet horizontally so that the left end of the cabinet
is accessible (see Figure 7).
Slide and align the UPS pedestals with the screw holes on the end
of the UPS cabinet. Secure the pedestals with the screws provided
in the accessory kit.
Figure 7. Installing the UPS Pedestals
®
9125 Two-in-One UPS (700–2000 VA) User's Guide
S
164201514 Rev B www.powerware.com