Bunn ULTRA Technical Training Manual page 8

Cold drinks dispensers
Hide thumbs Also See for ULTRA:
Table of Contents

Advertisement

INTRODUCTION
These instructions are for installing the Liquid Autofill Kits on Autofill ready ULTRA-2 cold drink dispensers.
There are three different kits available:
37960.0000
ULTRA-2 Liquid Autofill Kit 120V with Separate Water Lines
37960.0001
ULTRA-2 Liquid Autofill Kit 120V without Water Lines
37960.0002
ULTRA-2 Liquid Autofill Kit 230V with Separate Water Lines
INSTRUCTIONS
1.
Unplug machine from power source before removing any panels.
2.
Drain both hoppers and clean the machine if needed before proceeding.
3.
Remove hoppers, drip tray, both side
panels and front panel.
6.
Install level probe assembly into hole
and secure with nut provided.
BUNN-O-MATIC CORPORATION
37570.0000D 07/09 ©2005 Bunn-O-Matic Corporation
8
Ultra Training Manual
4.
Remove both motor covers and locate
.50" round knock out in top right area
of plastic drum mount.
7. Remove 4 screws holding in the main
circuit board.
(Continued)
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
ULTRA-2
INSTRUCTIONS FOR INSTALLING
LIQUID AUTOFILL KITS
5.
With a standard screwdriver and a
hammer, punch out the hole needed
for the level probe. Repeat this step
for both sides.
8. Connect Auto Fill board to main board.
Be sure to snap the plastic stand off's
completely into the main board.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultra-2Ultra 1Ultra 2

Table of Contents