Hopper Assembly; Electrical Install - Bunn ULTRA Technical Training Manual

Cold drinks dispensers
Hide thumbs Also See for ULTRA:
Table of Contents

Advertisement

Step 3: Place the machine in the desired location on the counter. Do not lift the Ultra by the drum(s).
Step 4: Document the complete serial number of the machine.
Step 5: Remove and save the black plastic drum support(s). This will be used as a servicing jig later.
Step 6: Adjust the legs on the machine so that it is level or slightly lower in the front.
Step 7: Remove the shipping eye bolts, located on the bottom of the machine, from the compressor.

Hopper Assembly

Step 1: Insert the auger nose
bushing from inside the hopper.
Step 4: Install the hopper over the
auger and cooling drum and slide it into
place.
Step 7: Plug in the hopper lid lamp
cord.
Step 10: Press down on the valve to
compress the spring. Position the faucet
handle over the faucet valve one side
at a time and snap into place on the
hopper.

Electrical Install

Step 1: Plug machine into 120VAC outlet.
Step 2: Install the seal(s) over the
flange at the rear of the cooling drum(s)
and press the seal(s) firmly into place
as shown.
Step 5: Push down until the hopper
lock plunger snaps into place.
Step 8: Position the faucet seal and
the return spring in the faucet valve.
Step 11: Install the drip tray and cover.
Step 3: Align the auger shaft(s) with
the auger(s). Push the auger(s) as far
as they will go and rotate so the flat face
of the auger shaft is aligned with the flat
face of the auger nose.
Step 6: Set the hopper lid on the hop-
per with lamp cord at the back.
Step 9: Slide the faucet valve assem-
bly into place on the hopper.
Bunn-O-Matic Corporation
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ultra-2Ultra 1Ultra 2

Table of Contents