Chapter 2 - Installation; Step 1: Unpack And Inspect - Toshiba Stratagy Flash Installation Manual

Voice processing system
Hide thumbs Also See for Stratagy Flash:
Table of Contents

Advertisement

Installation
Before starting the installation, read through these instructions thoroughly. Important information
is included in this guide that is crucial to a successful installation.

Step 1: Unpack and Inspect

1. When you receive the system, examine all packages carefully and note any visible damage. If
you find any damage, do not open the packages. Contact the delivery carrier immediately and
make the proper claims.
2. Check the items contained in the packages against the packing list. In addition to the hardware
components (shown below), you should receive a documentation package with the
Stratagy Flash that includes the Stratagy Flash Wall-Mounting Template and Instructions.
Stratagy Flash
V O I C E P R O C E S S I N G
3296
RJ11 cable for each port used
3. Inspect all equipment for damage. If equipment is missing or damaged, contact your supplier
immediately.
4. Remove any shipping tape and packing material used to protect the system during shipment.
Retain the packing materials for re-use when transporting system hardware.
Do not attempt to open the Stratagy Flash enclosure. There are no
CAUTION!
field-serviceable parts inside. Opening the Stratagy Flash system voids the
warranty.
Stratagy Flash Installation Guide
Power Supply
Parts not included:
02/02
24VAC
with flange standoffs
700 mA
(for drywall installation)
6 ft. cord
Stratagy Admin Cable (SG-ADMCBL)
for communicating with computer or modem
(available from Toshiba)
2
2 mounting screws
2 wall anchors
7

Advertisement

Table of Contents
loading

Table of Contents