Removing the throttle bodies
4 Nm (0.4 m
kg, 2.9 ft
•
Order
Seat/Air filter case
Fuel tank
1
Throttle position sensor coupler
2
Cylinder-#1 intake air pressure sensor hose
3
Cylinder-#2 intake air pressure sensor hose
Intake solenoid vacuum hose (one-way valve to
4
throttle body)
5
Throttle cable
6
Throttle body joint clamp screw
7
Throttle body
8
Throttle position sensor
LS
Ib)
•
6
2
Job/Parts to remove
5
4 Nm (0.4 m
7
6
3
1
4
Q'ty
Refer to "GENERAL CHASSIS" on page
4-1.
Refer to "FUEL TANK" on page 6-1.
1
Disconnect.
1
Disconnect.
1
Disconnect.
1
Disconnect.
2
Disconnect.
2
Loosen.
EC5YU1030
CAUTION:
1
The throttle body should not be
disassembled.
1
For installation, reverse the removal
procedure.
6-6
THROTTLE BODIES
kg, 2.9 ft
Ib)
•
•
8
4 Nm (0.4 m
kg, 2.9 ft
•
Remarks
Ib)
•