Load Monitor - Nibe F1245 Installer Manual

Ground source
Hide thumbs Also See for F1245:
Table of Contents

Advertisement

EB100 - Master
AA3-X4
A
15
B
14
GND
13
EB101 - Slave 1
AA3-X4
A
15
B
14
GND
13
A
B
GND
EB102 - Slave 2
AA3-X4
A
15
B
14
GND
13
A
B
GND
NIBE™ F1245
F1245
AA3-X4
F1245
AA3-X4
F1245
AA3-X4

Load monitor

NOTE
The load monitor has no function in a 1-phase
installation.
When many power consumers are connected in the
property at the same time as the electric addition is
operating, there is a risk of the property's main fuse
tripping. The heat pump has integrated load monitors
that control the electrical steps for the electrical addi-
tion by redistributing the power between the different
phases or disengaging in event of overload in a phase.
Reconnection occurs when other current consumption
is reduced.
Connecting current sensors
A current sensor should be installed on each incoming
phase conductor in to the distribution box to measure
the current. The distribution box is an appropriate in-
stallation point.
Connect the current sensors to a multi-core cable in an
enclosure next to the distribution box. Use a multi-core
cable of at least 0.5 mm2 from the enclosure to the
heat pump.
Connect the cable to the input card (AA3) on terminal
block X4:1-4 where X4:1 is the common terminal block
for the three current sensors.
The size of the property's main fuse is set in menu
5.1.12.
Incoming electricity
Inkommande el
PEN
L
L
L
1
2
3
Elcentral
Electrical distribution
unit
Värmepump
Heat pump
F1245
AA3-X4
Chapter 5 |
-T1
-T2
-T3
1 2 3 4
AA3-X4
Electrical connections