Sym Mio 50 Service Manual page 189

Table of Contents

Advertisement

16. Electrical Equipment
Alternator charging coil
Caution
The check of alternator charging coil and
illumination coil can be done when the
alternator is mounted on engine.
Check
Remove the 4P coupler of the alternator.
Measure the resistance between the white wire on
the alternator and frame ground with a
multi-meter.
Standard value: 0.2-1.0Ω
Replace the alternator charging coil if the
measured value exceeds standard.
Alternator lighting coil
Check
Remove the 4P coupler of the alternator.
Measure the resistance between the yellow wire
on the alternator and frame ground by multi-meter.
Standard value: 0.1-0.8Ω
Resistor check
Remove the front cover.
Measure the resistance between the resistor wire
(pink & green/black) and frame ground.
Standard:
30W/5.9Ω±10% (pink)
HU10U/W 5W/10.2Ω±10% (green/black)
HU05U
5W/12Ω±10% (green/black)
16-10
To this chapter contents
Charging/Illumination coil connector
Resistor

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Mio 50 and is the answer not in the manual?

Table of Contents

Save PDF