Ignition Pulse Generator Inspection - Honda Nighthawk CB 750 1991 Service Manual

Nighthawk nighthawk cb 750
Table of Contents

Advertisement

Ignition System
Inspection
Disconnect the ignition coil primary terminals under the fuel
tank
and
measure the
primary coil
resistance
of
the
ignition
coil.
Standard : 2.6
-
3.2.Q (2UCI68'Fl
.
Disconnect
the
spark
plug
caps
from
the
spark
plug
and
measure
the
secondary
coil
resistance with
the spark
plug
wire
at
each
ignition
pair :
L
No.
114
secondary
coil
:
between
cylinders
1
and
4
wire
No.213
secondary
coil
:
between
cylinders
2
and
3
wire
Standard : 1 8
-
22kR (2OCl68'Fl
If
the
resistance
is
-
(open
wire),
disconnect
the
spark
plug
.
.
cap and measure the secondary coil resistance as shown.
Standard : 1 3
-
17kQ (2UCI68'Fl
If the resistance is
m
(open wire), disconnect the spark plug
wire and measure the secondary coil resistance as shown.
Standard : 1 3
-
17kQ (20ZI6BF)
lgnition
Pulse
Generator
Inspection
I
/Y
I
NOTE
It is not necessary remove the ignition pulse geneator
from the engine.
Remove the fuel tank (page 2- 4).
Disconnect the ignition pulse generator 4P connector.
Measure the resistance between the Yellow and White1
Yellow terminals.
Standard : 297
-
363Q (20%/68F)
(1) IGNITION PULSE GENERATOR CONNECTOR

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents