2.2
Preparing for System Installation
The site must be properly prepared for the system to be installed.
Make sure that you have the tools needed for the installation. Wait for
any condensation on the metal surfaces to evaporate before powering
up the system. Table 2–2 gives the joining kits required for the
installation.
Table 2–2 Joining Kits Required for Installation
Joining Kit
Power cabinet to system cabinet 1
(part of power cabinet assembly)
Expander cabinet to power or system
cabinet
2-6
AlphaServer GS160/320 Installation Guide
Part Number
70-40120-01
70-40120-02