8. OFF1
- HW OFF
9. ON2
10. OFF2
- HW OFF
11. ON3
12. OFF3
- HW OFF

4:11.8 PROGRAMMING PROCEDURE

To create a programme the same method is used as for setting the Clock.
With the Timer/Programmer in the operating mode and the Display showing the correct Time and Day. (Refer
to
section
4:11.4)
Display >
Press
twice
Display >
Press
to answer
Display >
Press
to change ON1 in sequence or -
Press
to continue through sequence
Display >
Use
and
to change time by 10 min intervals.
Press
- time is now set.
Continue through sequence pressing
On completion Press

4:11.9 TEST

The Test facility is a unique feature of the Boulter Programmer. Test enables a quick review of the 7 day
programme.
TO USE 'TEST' With the Timer/Programmer in the operating mode and the Display showing the correct Time
and Day.
file://D:\PL47000\PL47000.htm
20. OFF1
- HW ON
21. ON2
22. OFF2
- HW ON
23. ON3
24. OFF3
(after
)
to change setting and
three times to return to operating mode.
- HW OFF
- HW ON
- HW OFF
- HW ON
- HW OFF
to continue.
Page 32 of 67