Phial Positions - Boulter Camray 5 Installation & Maintenance Manual

Boulter camray 5 oil fired boilers
Table of Contents

Advertisement

Page 26 of 67
2. Insert Mains Plug into the mating Mains Socket on the underside of the Control Panel.
3. Insert 4 pin Burner Plug on the end of the Burner Cable into its mating Socket on the underside of the
Control Panel. See
Fig.
4:10a.
NOTE: The 4 pin plug has an engagement peg. Depressing the peg with a small screwdriver allows the
release of the plug from the socket.

4:10.2 Phial Positions

1. Insert the Boiler Control Stat 8mm Plain Phial into a pocket on the top of the Boiler Heat Exchanger as
shown in
Fig.
4:10b.
2. Insert the Limit Stat 8mm Coiled Phial into the second pocket on the top of the Boiler Heat Exchanger. See
Fig.
4:10b.
file://D:\PL47000\PL47000.htm
14/04/2005

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Boulter Camray 5

Table of Contents