The Hearth; The Chimney - Boulter Camray 5 Installation & Maintenance Manual

Boulter camray 5 oil fired boilers
Table of Contents

Advertisement

Page 16 of 67
Consideration must be given however, to the following points.
1. Noise may be accentuated by the installation in small rooms or recesses with hard or hollow stud wall
surfaces. Due consideration to the siting of boilers should be given.
Further advice from BOULTER BUDERUS should be sought where any doubt exists.
2. Some individuals may be particularly sensitive to even low noise levels and this should be discussed before
installation.
3. The type of chimney, position relative to the boiler and whether a draught stabiliser is to be fitted may affect
sound level in the room.
4. The 40/65 & 65/95 Boiler models are serviced from the front. A space of 450mm (18") in front should be
available.
5. The 100/130 Boiler models are serviced from the front and top. A space of 450mm (18") in front and above
the Boiler should be available.
6. Any kitchen work top above the 100/130 Boiler must be removable for service access.

4:4 THE HEARTH

The Camray 5 & Camray 5 Utility have a Hearth Temperature of less than 85°C. The boiler requires a level
hearth on which to stand which should comply with the Building Regulations.
If the Boiler is to stand on a floor made of combustible material then protection between the Boiler and the
floor should be provided by means of non combustible material.
Consideration should be given to the Weight of the Boiler and the Building Regulations regarding floor
loading.
The filled Boiler weight can be found in 3:5.
Advice should be sought from your local Building Control Office if there are any doubts regarding the floor
supporting the Boiler.
BOULTER BUDERUS CAMRAY 5 PAGE 10
4:5 THE CHIMNEY - (FLUE Ø 4" OR 5")
CONVENTIONAL CHIMNEY INSTALLATION ONLY.
VERY IMPORTANT
All Camray 5 and Camray 5 Utility boilers are supplied in Balanced Flue Form.
To connect either size of boiler to a conventional chimney you must use The Conventional Flue
adaptor (40/95 Part No. FC4CF, 100/140 Part No. FC5CF).
This includes all parts necessary to make the connection to the boiler. A test point is also provided
for ease of installation and commissioning. Secure the air duct in the clip provided.
The use of this adaptor is essential for safe performance and is a condition of the guarantee that this
must be fitted.
file://D:\PL47000\PL47000.htm
14/04/2005

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents