Deaerator Pipe Oil System - Oil Connections Diagram; Oil Burner; Burner Pump For Two Pipe And Deaerator System - Boulter Camray 5 Installation & Maintenance Manual

Boulter camray 5 oil fired boilers
Table of Contents

Advertisement

Page 24 of 67
BOULTER BUDERUS CAMRAY 5 PAGE 16

4:9 OIL BURNER

The Burner makers' technical leaflet is supplied with this manual and provides supplementary information not
included in this manual.

4:9.1 Burner Pump for Two Pipe and Deaerator System

For two pipe oil systems the Burner Oil Pump has to be fitted with the Bypass Screw supplied. Boilers are
despatched with the Bypass Screw in a labelled envelope attached to the Burner. This socket screw is
inserted into the return port as shown in
Fig.
4:9a.
file://D:\PL47000\PL47000.htm
14/04/2005

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents