York HA090 Technical Manual page 130

Split-system air-cooled condensing units
Table of Contents

Advertisement

LEFT
A
FRONT
FIGURE 5 - HA/ HB UNIT DIMENSIONS
TABLE 15: UNIT DIMENSIONS (INCHES)
MODEL
HA300
HB360
HB480
HB600
PIPING AND ELECTRICAL CONNECTIONS
Piping connections are made from the rear of the unit.
Connections can be made directly to the suction and
liquid piping or if so equipped to the optional suction
and liquid line service valves.
With the piping connections being made at the rear of
the unit, piping can be routed to the unit from the left or
right side.
Electrical connections for power and control wiring is
made from the front of the unit, left of the electrical con-
trol box access. See Tables 17, 18 and 19 and Figures
18
http://www.rezine.net
G
H
A
B
C
110.5
88.5
37.5
110.5
88.5
37.5
128.5
88.5
37.5
128.5
88.5
57.7
REAR
B
F
D
E
32.8
31.0
32.8
31.0
41.8
40.0
41.8
40.0
6 thru 10 for piping sizes and electrical knockout
details.
TABLE 16: UNIT CLEARANCES
Location
*
Overhead (Top)
Front access panels
Lef t Side
Right Side
Rear
Bottom
*
Units must be installed outdoors. Overhanging structures or
shrubs should not obstruct condenser air discharge.
Adequate snow clearance must be provided if winter operation
is expected.
Page 130
036-21328-003-D-0206
C
D
E
RIGHT
F
G
H
46.1
37.1
23.6
46.1
37.1
23.6
46.1
37.1
23.6
46.1
37.1
23.6
Dimensions
120"
36"
30"
30"
24"
0"
Unitary Products Group

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents