Daikin RQYQ140-180PY1 Service Manual page 68

R-410a heat pump 50hz and r-410a heat recovery 50hz
Table of Contents

Advertisement

Detailed Control Functions
[All-room cooling → all-room heating or simultaneous cooling and heating]
HP/LP gas pipe
Suction gas pipe
HP/LP gas pipe
Suction gas pipe
HP/LP gas pipe
Suction gas pipe
[All-room heating or simultaneous cooling and heating → all-room cooling]
HP/LP gas pipe
Suction gas pipe
HP/LP gas pipe
Suction gas pipe
59
Liquid
pipe
Cooling
Cooling
Cooling
Liquid
pipe
Liquid
pipe
Heating
Heating
Heating
Liquid
pipe
Heating
Heating
Heating
Liquid
pipe
Ventilation Ventilation
Ventilation
HP/LP gas pipe
Suction gas pipe
Liquid
pipe
Cooling
Cooling
(1) While all indoor units are in cooling
Cooling
Cooling
(2) Mode changeover
All indoor units
(3) Heating or simultaneous cooling and
Each indoor unit
Heating
Heating
Heating
Heating
Ventilation Ventilation
Cooling
Cooling
Cooling
operation
HP/LP gas pipe is used as a suction gas
pipe.
Switch HP/LP gas pipe from low to high
pressure
• Fan stop
Changeover time is 3.5 minutes
(changeover time for control). (During
the changeover: stop the compressor
for 30 seconds.)
heating
Starts the hot air supply operation by
cold air prevention control (3-5
minutes)
(1) While the unit is in heating operation or
simultaneous cooling and heating
operation
HP/LP gas pipe is used as a discharge
gas pipe.
(2) Mode changeover
Switch HP/LP gas pipe from high to low
pressure
All indoor units
Ventilation
Changeover time is 3.5 minutes
(changeover time for control). (During
the changeover: Stop the compressor
for 30 seconds.)
(3) Change all units to cooling operation.
Cool air supply operation
SiBE341001
Function

Advertisement

Table of Contents
loading

Table of Contents