Installing the Switch
Installation Procedure
W A R N I N G
E q u i p m e n t
C a b i n e t
N o t e
2-8
If the ports are connected to active network devices, the Link/Act
LEDs stay on or may be blinking to indicate port activity. The Spd
LEDs turn on for 1000 Mbps links, blink for 100 Mbps links, or
stay off for 10 Mbps links.
If the ports are not connected to active network devices, the Link/
Act and Spd LEDs will stay off.
If the LED display is different than what is described above, the self test
has not completed correctly. Refer to "Troubleshooting" for diagnostic help.
3.
Remove power to the switch before mounting.

3. Mount the Switch

The switch can be mounted in these ways:
on a horizontal surface
on a wall
under a table
rack or cabinet (1810-24 and 1810-24G Switch only)
Rack or Cabinet Mounting
The 1810-24 and 1810-24G Switches are designed to be mounted in any EIA-
standard 19-inch telco rack or communication equipment cabinet. Note that
the mounting brackets have multiple mounting holes and can be rotated
allowing for a wide variety of mounting options.
For safe operation, please read the "Installation Precautions" on
page 2-3
and
page
2-3, before mounting the switch.
The screws supplied with the switch are the correct threading for standard
EIA/TIA open 19-inch racks. If you are installing the switch in an equipment
cabinet such as a server cabinet, use the clips and screws that came with the
cabinet in place of the screws that are supplied with the switch.
Complete the following step 1 to attach brackets to the switch. Then, plan
which four holes you will be using in the cabinet and install all four clips. Then
proceed to step 2 to install the switch in the cabinet.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1810-241810-8g1810-24gJ9800aJ9801aJ9802a ... Show all

Table of Contents