Servicing Instructions; Replacement Of Parts; To Gain General Access; Removing The Front Panel - Ariston Type C Installation, Servicing And Operating Instructions

Type c boilers
Table of Contents

Advertisement

SERVICING INSTRUCTIONS

To ensure efficient safe operation, it is recommended that the
boiler is serviced annually by a competent person, refer to
Section 20 (page 54) for the Servicing Schedule.
Before starting any servicing work, ensure both the gas and
electrical supplies to the boiler are isolated and the boiler is
cool.
Before and after servicing, a combustion analysis should be
made via the flue sampling point.
After servicing, preliminary electrical system checks must be
carried out to ensure electrical safety (i.e. polarity, earth
continuity, resistance to earth and short circuit).
I
!
MPORTANT
A
,
FTER AN ANNUAL SERVICE
THE
25,
60)
PAGE
MUST BE COMPLETED

18. Replacement of parts

The life of individual components vary and they will need
servicing or replacing as and when faults develop.
The fault finding sequence chart in Section 19 will help to locate
which component is the cause of any malfunction, and
instructions for removal, inspection and replacement of the
individual parts are given in the following pages.

18.1 To Gain General Access

All testing and maintenance operations on the boiler require the
control panel to be lowered. This will also require the removal of
the casing.

18.1.1 Removing the front panel :

1. Remove the security screw and unlock the two case
locking catches A (see Figs. 44 & 45);
2. Remove the front panel from the rest of the casing (see
Fig. 46).

18.1.2 Lowering the control panel :

1. Remove the front panel;
2. Unlock the two clamps locking and pivot the electrical
box downward (see Fig. 47).
S
I
R
(S
ERVICE
NTERVAL
ECORD
.
ECTION
A
Fig. 44
Fig. 45
Fig. 46
Fig. 47
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Combi a 24 mffiCombi a 30 mffi

Table of Contents