Servicing Instructions; Replacement Of Parts; To Gain General Access; Removing The Front Panel - Ariston C Operating Instructions Manual

Type c boilers
Table of Contents

Advertisement

SERVICING INSTRUCTIONS

To ensure efficient safe operation, it is recommended that the
boiler is serviced annually by a competent person.
Before starting any servicing work, ensure both the gas and
electrical supplies to the boiler are isolated and the boiler is
cool.
Before and after servicing, a combustion analysis should be
made via the flue sampling point (see Section 14.3, steps 1-6).
After servicing, preliminary electrical system checks must be
carried out to ensure electrical safety (i.e. polarity, earth
continuity, resistance to earth and short circuit).

18. Replacement of parts

The life of individual components vary and they will need
servicing or replacing as and when faults develop, instructions for
removal, inspection and replacement of the individual parts are
given in the following pages.

18.1 To Gain General Access

All testing and maintenance operations on the boiler
require the control panel to be lowered. This will also
require the removal of the casing.

18.1.1 Removing the front panel :

1. Unlock the two clamps A (see Fig. 48);
2. Remove the front panel from the rest of the
casing (see Fig. 49).

18.1.2 Lowering the control panel :

1. Remove the front panel;
2. Push in the tabs on either side of the electrical
box (see Fig. 50) and pivot the electrical box
forward.
46
A
Fig. 48
Fig. 49
Fig. 50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

System a 24 mffiSystem a 30 mffi

Table of Contents