Electrical Interference Suppression; Restart After Fault Clearance - ELGO Electronic P40-SN002 Series Operation Manual

Application metal shears programmable controller
Table of Contents

Advertisement

Shielding:
All external signal wires have to be installed shielded:
1. Rotary encoder wires and analog input wires
2. Wires for all other input signals
3. Wires for all output signals
4. Wires from the power supply to the controller
All shields have to be connected centrally low ohm to PE (earth potential), connect only one sided at the
controller.
8.2

Electrical interference suppression

Signal wires should be installed separately from load power lines and with a safe
distance of at least 0.5 m to capacitive and inductive interferences such as contactors,
relays, motors, switching power supplies, timed controllers.
If interferences occur in spite of applying all above mentioned measures proceed as
follows:
1. Add RC elements over contactor coils of AC contactors (for example 0,1 µF/100
2. Add recovery diodes over DC inductances
3. Add RC elements over each drive phase (in connector box of the drive).
4. Do not connect the GND potential with PE (earth potential)!
Install a power filter before the external power supply
8.3

Restart after fault clearance

After fault clearance:
1. Reset emergency stop switch.
2. Quit disturbance on controller.
3. Make sure that no person is located in the danger zone.
4. Start operating as explained in the instructions.
ADVERT!
Do not connect the controller / measuring system GND to PE (protective earth).
Do not connect the shielding on both sides to PE (protective earth).
If the PE potential is heavily "contaminated" by interference voltages try to connect
the shielding to the GND potential instead of PE (protective earth).
Ω)
- 42 -
Interferences

Advertisement

Table of Contents
loading

Table of Contents