11.3.
R eplacing
t he
P CB
STEP
# 1.
I f
t he
P CB
s tops
w orking,
b egin
r eplacement
b y
t aking
o ff
t he
f ront
h ousing
and
c ontrol
p anel.
STEP
# 2.
S ee
p icture
b elow.
R emove
s ix
( 6)
s crews
t o
t ake
a part
m ain
P CB
c over.
P ull
out
l ead
w ire
o f
t he
P CB
STEP
# 3.
R eplace
t he
m ain
P CB
o r
d isplay
P CB.
STEP
# 4.
R e-‐install
a ll
i tems
a bove.
11.4 Replacing
t he
t emperature
a nd
h umidity
s ensors
The
T emp/Humidity
S ensor
m ay
b e
r emoved
w ithout
r emoval
o f
t he
P CB
o r
r ear
c over
i f
you
a re
c areful
w hen
y ou
d isconnect
a nd
r econnect
t he
l eads
f rom
t he
P CB.
STEP
# 1.
T ake
o ff
t he
f ront
h ousing
a nd
c ontrol
p anel.
STEP
# 2.
R emove
t wo
( 2)
s crews
s ecuring
t he
s ensor
t o
t he
f ront
o f
t he
e vaporator
c oils.
STEP
# 3.
D isconnect
w ire
f or
t he
t emperature
a nd
h umidity
s ensors
f rom
t he
P CB.
STEP
# 4.
R eplace
t he
t emperature
a nd
h umidity
s ensor.
STEP
# 5.
R e-‐install
c ontrol
p anel,
h ousing,
e tc.
11.5 Replacing
t he
f use
o f
P CB
WARNING:
W hen
r eplacing
t he
f use,
b e
s ure
t o
u se
o nly
a
f use
o f
t he
s ame
r ating
(ampere
r ating
i s
6 .3A)
STEP
# 1.
T ake
o ff
t he
f ront
h ousing
t o
a ccess
f use
a nd
P CB.
STEP
# 2.
R emove
t wo
( 2)
s crews
t o
t ake
a part
m ain
P CB
c over.
STEP
# 3.
T ake
a part
f use
c over
a nd
r eplace
f use.
STEP
# 4.
R eplace
t he
f use
o f
m ain
P CB
STEP
# 5.
R eassemble.
Service
M anual
I deal
A ir
C G2
C ommercial
G rade
D ehumidifier
Sunlight
S upply,
I nc.
19