Start And Stop Procedures And Basic Operation - Omron POWLI BU60RE Instruction Manual

Uninterruptible power supply
Table of Contents

Advertisement

3
.Operation
3-2

Start and stop procedures and basic operation

When the power switch is OFF and the AC input plug is connected to a
commercial power supply:
• The details of the most recent error are displayed. (item 4 on page 24)
• The status indicator displays "
• Power output is stopped.
• The battery automatically starts recharging.
Start procedure
Turn on the power switch of the UPS.
Operation
• Output begins in Inverter Operation a few seconds after the switch is activated.
(Status indicator "
• The status indicator displays "
for about 10 seconds. (If the battery voltage is low, the self-diagnostic test is not performed. It is
automatically executed after the battery is charged.)
When the self-diagnostic test fi nishes successfully, switching to AC output from commercial
power is performed and normal operation starts.
• When the self-diagnosis test finishes normally, the unit enters the normal operating state
through inverter operation.
• When the self-diagnostic test is not performed, AC output begins immediately inverter
operation.
Power supply output receptacles
• During operation, the battery is charged automatically.
20
")
Status indicator
Beep
ON
AC input
OFF
7 seg.
ON
Power supply SW
OFF
ON
Power supply
output lamp
OFF
Operating mode
Commercial Power
Battery
Commercial Power
Output
Battery
<Note>
D-1 : The most recently displayed error code (refer to item 4 on page 24)
(If no errors have occurred, "
".
", and the self-diagnostic test is performed in Battery Mode
None
Outputs power (connected devices are powered)
D-1
Inverter
Startup
operation
preparation
a few
about
1 sec.
seconds
2 to 3 sec.
" is displayed.)
Inverter
Self-diagnostic
operation
test
about
10 sec.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powli bu100re

Table of Contents