Jøtul GF300 DV IPI Allagash Installation And Operation Instructions Manual page 40

Direct vent gas heater
Table of Contents

Advertisement

139495_Rev_C GF 300 DV IPI 9/11/12
40
This appliance must be installed in conformance with local and national building regulations. Before
beginning the installation, it is important that the these instructions be carefully read and understood.
Jøtul maintains a policy of continual product development. Consequently, products may differ in speci-
fication, color or type of accessories from those illustrated or described in various publications.
Jøtul vise sans cesse a ameliorer ses produits. C'est pourquoi, il se reserve le droit de modifier les specifi-
cations, couleurs etequipement sans avis prelable.
Jøtul ASA
P.O. Box 1411
N-1602 Fredrikstad
Norway
Jøtul North America
55 Hutcherson Dr.
Gorham, Maine 04038-2634

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents