Jøtul GF300 DV IPI Allagash Installation And Operation Instructions Manual

Jøtul GF300 DV IPI Allagash Installation And Operation Instructions Manual

Direct vent gas heater

Advertisement

WARNING: If the information in these
instructions is not followed exactly, a fire
or explosion may result causing property
damage, personal injury or loss of life.
– Do not store or use gasoline or other
flammable vapors and liquids in the vicinity
of this or any other appliance.
– WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electrical switch; do not
use any phone in your building.
• Immediately call your gas supplier from a
neighbor's phone. Follow the gas supplier's
instructions.
• If you cannot reach your gas supplier, call
the fire department.
– Installation and service must be performed
by a qualified installer, service agency or the
gas supplier.
– In the Commonwealth of Massachusetts,
a carbon monoxide (CO) detector shall be
installed in the same room as the appliance.
This appliance may be installed in an aftermarket,
permanently located, manufactured home or mobile
home, where not prohibited by local codes.
This appliance is only for use with the types of gas
indicated on the rating plate. A conversion kit is
supplied with the appliance.
INSTALLER: Leave this manual with the appliance.
CONSUMER: Retain this manual for future reference.
Installation and

Operation Instructions

ATTENTION : CES INSTRUCTIONS DOIVENT
DEMUERER AVEC LE PROPRIÉTERE D'UNE
MAISON.
AVERTISSEMENT: Assurez-vous de bien
suivreles instructions données dans cette
notice pour réduire auninimum le risque
d'incendie ou d'explosion ou pour éviter
tout dommage matériel, toute blessure ou la
mort.
– Ne pas entreposer ni utiliser d'essence ni
d'autres vapeurs ou liquides inflammables
dans le voisinage de cet appareil ou de tout
autre appareil.
– QUE FAIRE SI VOUS SENTEZ UNE ODEUR DE GAZ:
• Ne pas tenter d'allumer l'appareil.
• Ne touchez à aucum interrupteur.
Ne pas vous servir des téléphones se
trouvant dans le bâtiment où vous
trouvez.
• Appelez immédiatement votre
fournisseur de gaz depuis un voisin.
Suivez les instructions du fournisseur.
• Si vou ne pouvez rejoindre le
fournisseur de gaz, appelez le service des
incendies.
– L'installatione l'entretien doivent être
assurés par un installateur ou un service
d'entretien qualifié ou par le fournisseur
de gaz.
139495_Rev_C GF 300 DV IPI 9/11/12
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GF300 DV IPI Allagash and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Jøtul GF300 DV IPI Allagash

  • Page 1: Operation Instructions

    139495_Rev_C GF 300 DV IPI 9/11/12 Installation and Operation Instructions WARNING: If the information in these ATTENTION : CES INSTRUCTIONS DOIVENT instructions is not followed exactly, a fire DEMUERER AVEC LE PROPRIÉTERE D’UNE or explosion may result causing property MAISON. damage, personal injury or loss of life. AVERTISSEMENT: Assurez-vous de bien suivreles instructions données dans cette –...
  • Page 2: Service Tools

    139495_Rev_C GF 300 DV IPI 9/11/12 WARNING Installation Requirements for the Commonwealth of Massachusetts THIS PRODUCT MUST BE INSTALLED BY HOT GLASS WILL A LICENSED MASTER OR JOURNEYMAN PLUMBER OR GAS-FITTER WHEN CAUSE BURNS INSTALLED IN THE COMMONWEALTH OF DO NOT TOUCH GLASS MASSACHUSETTS.
  • Page 3: Table Of Contents

    139495_Rev_C GF 300 DV IPI 9/11/12 Table of Contents Jøtul GF 300 DV IPI Allagash Service Tools ..........2 Direct Vent Gas Heater Specifications ..........4 General Information ........4 Manufactured and Distributed by: Jøtul North America Unpacking Your Stove ......5 55 Hutcherson Dr.
  • Page 4: Specifications

    139495_Rev_C GF 300 DV IPI 9/11/12 GF 300 DV IPI General Information Specifications THIS HEATER MUST BE INSTALLED AND MAINTAINED  BY A QUALIFIED SERVICE AGENCY. Input Rates The installation and repair of this appliance must be  Natural Gas done by a qualified service person. Failure to properly 2 6,000 BTU/hr. maximum input install and maintain this heater could result in an 15,000 BTU/hr. minimum input unsafe or hazardous installation, which may result in Propane...
  • Page 5: Unpacking Your Stove

    139495_Rev_C GF 300 DV IPI 9/11/12 Safety Information Installer l’appareil selon les codes ou reglements  locaux, ou, en l’absence de tels reglements, selon les  Due to the high operating temperatures this appliance Codes d’installation CAN/CGA-B149. should be located out of traffic and away from furniture, draperies, etc. Maintain proper clearance to DO NOT OPERATE THIS STOVE IF ANY PART HAS BEEN  combustible mantels and fireplace trim. UNDER WATER. Call a qualified service technician to inspect the heater and to replace any part of the con-  Children and adults should be alerted to the hazards trol system and any gas control which may have been of high surface temperatures and should stay away to...
  • Page 6: Location

    139495_Rev_C GF 300 DV IPI 9/11/12 Safety Information cont'd. Hearth Requirements  Cet appareil ne sert pas avec des portes en verre de This appliance CANNOT be installed directly on carpeting, marché des accessoires. vinyl, linoleum or wood laminate flooring, such as Pergo ®  Wear gloves and safety glasses while installing or If this appliance will be installed on any combustible performing maintenance procedures on this appliance.
  • Page 7: Clearances

    139495_Rev_C GF 300 DV IPI 9/11/12 Stove and Vent Clearance Requirements Minimum Clearances to Combustibles: See figs. 2-4. Rear: 2” (51 mm) Ceiling: 61” (1550 mm) Corner: 2” (51 mm) Sides: 3” (76 mm) Figure 3. Parallel Installation Clearances. Minimum Clearances from the Vent Pipe to Combustibles: Horizontal Run: Off the top of the pipe 2” (51 mm) Off the sides and bottom 1” (25 mm) Vertical Run: All sides...
  • Page 8: Vent Requirements

    139495_Rev_C GF 300 DV IPI 9/11/12 Venting Requirements Vent Restriction The GF 300 DV IPI is equipped with an Exhaust Restrictor The Jøtul GF 300 DV IPI gas stove may be installed with a vertical or horizontal termination and must conform to Plate which enables you to regulate the flow of exhaust the configuration requirements described below. gas. The plate prevents overly strong draft that can cause poor combustion and weak flame picture. Follow the This appliance is approved for use with vent systems guidelines below, and on the following pages, to deter- from the following manufacturers: mine the correct restrictor plate setting for your particu- •...
  • Page 9: Termination Matrix

    139495_Rev_C GF 300 DV IPI 9/11/12 Figure 8. ZONE E: For terminations between 24-35 feet. Install Exhaust Outlet Restrictor Extension in addition to Restrictor setting A. Detach the plate as shown and re-install oriented upside down from the original Figure 7. Exhaust restrictor positions - viewed from front position.
  • Page 10: Air Deflector Plates

    139495_Rev_C GF 300 DV IPI 9/11/12 Burner Skirt Plates Figure 10. Burner Skirt Plate Zones. 35 Ft. (10.67 m) Air flow around the burner is critical to providing efficient combustion as well as a beautiful 30 Ft. flame picture. The GF 300 IPI is (9.14 m) shipped with two sets of plates INSTALL specifically designed to modify SLOTTED the burner skirt in order to achieve...
  • Page 11: Vertical Termination

    139495_Rev_C GF 300 DV IPI 9/11/12 Vertical Vent Termination Horizontal Overhang The Jøtul GF 300 DV IPI can be vertically vented through a ceiling or to a roof termination with the following 18”. 18”. guidelines: min. min. The termination should fall within the shaded areas  of the grids depicted in the Vent Window diagrams on Lowest Discharge Opening pages 10 - 11.
  • Page 12 139495_Rev_C GF 300 DV IPI 9/11/12 Co-linear Vent Installation #991 High Wind Cap Exhaust Gas The GF 300 DV IPI may be vented through a masonry or Class A prefabricated chimney using a Co-linear Flexible Intake Air Vent system approved for use with a solid-fuel burning Max. Co-linear fireplace. When installed in the manner described below, Height - 35 ft. (10.66 m) this system can improve the performance of the appli- ance in cold climate situations, as well as simplify the Min. Co-linear vent installation. See fig. 15. Height - 8 ft. (2.44 m) Consult with the local code authority having jurisdic- tion before proceeding with this type of installation. Refer to the vent manufacturer’s instructions for specific installation requirements.
  • Page 13 139495_Rev_C GF 300 DV IPI 9/11/12 Masonry or Prefabricated Chimney Vertical Exhaust Conversion Termination Cap Adaptor- Intake Air IMPORTANT NOTICE IN THE U.S.,THE USE OF AN EXISTING CHIMNEY AS AN AIR INTAKE IS NOT COVERED UNDER THE ANSI 4” Flex Pipe Z21.88-1999-CSA 2.33-M99 TEST METHODS AND not included RESULTING ITS/WHI PRODUCT CERTIFICATION. THE in kit CODE AUTHORITY HAVING JURISDICTION MUST BE CONSULTED PRIOR TO PROCEEDING WITH THIS INSTALLATION METHOD.
  • Page 14: Horizontal Termination

    139495_Rev_C GF 300 DV IPI 9/11/12 Horizontal Termination Min. 12” 305mm Any horizontal termination must fall within the shaded  portion of the vent window matrix shown in fig. 9. For Snorkel Terminations, see below. Any horizontal termination except a snorkel termina-  tion, must include: Min. 24” 610mm 1) Minimum rise of 24 in. Minimum horizontal run of 12 in. when vertical run is less than 8 ft. 56 1/2” Vertical run no more than 35 ft. 1435mm Horizontal run no more than 27 ft. No more than four 45° or two 90° Elbows The horizontal termination cap must maintain a 3"  clearance to any overhead combustible projections 2 1/2" or less. It must also maintain 12" clearance from projections exceeding 2 1/2". See fig. 22. Figure 18. Wall Cut-out Opening: A minimum 10" X 10" (250 mm  • Minimum vent for horizontal termination. x 250 mm) square hole is required for proper pipe •...
  • Page 15: Vent Terminal Clearances

    139495_Rev_C GF 300 DV IPI 9/11/12 Horizontal Termination Clearance Vent Terminal Air Supply Terminals Prohibited in this Area Figure 21. Vent Terminal Clearances - ANSI Z21.88-2009, CSA 2.33-2009, and National Fuel Gas Code. A = Clearance above grade, veranda, porch , deck, or balcony M = Clearance under veranda, porch, deck, or balcony: : 12 inches (30 cm) minimum. 12 inches (30 cm) minimum. B = Clearance to window or door that may be opened: N = Clearance to propane tank relief valve and filler connec- **Min. 9 inches, U.S. / *12 inches (30 cm) CAN. tion***: We recommend 12in. minimum to prevent condensation 5 feet (1.52 m) minimum to tanks not filled on site on the window.
  • Page 16: Mobile Home Installation

    139495_Rev_C GF 300 DV IPI 9/11/12 Mobile Home Installation WARNING: The GF 300 DV IPI can be installed for use in a mobile THE CONVERSION KIT IS TO BE INSTALLED BY AN AUTHORIZED JØTUL SERVICE TECHNICIAN home in the U.S. and Canada provided: IN ACCORDANCE WITH THE MANUFACTURER’S 1. The stove is secured to the floor of the mobile home. INSTRUCTION AND ALL CODES AND REQUIRE- Use Jøtul Floor Bracket Kit #750304.
  • Page 17 139495_Rev_C GF 300 DV IPI 9/11/12 Fuel Conversion Procedure 1. Turn off gas supply to stove. 2. Remove the stove Top Plate. 3. Disengage the two Glass Frame Latches and lift the glass panel frame up and out of the stove. See illustra- tion on page 5. 4. If installed, remove the Embers and Log Set using care not to damage the fragile log parts. 5. Lift out the Burner Skirt.
  • Page 18: Gas Supply Connection

    139495_Rev_C GF 300 DV IPI 9/11/12 Fuel Conversion, cont’d. 15. Correct gas pressure is essential for efficient and safe operation of this appliance. Use a manometer to check Leak test: pressures as specified in the Gas Pressure section of 1. Mix a 50-50 solution of water and dish this manual (page 19). soap. 16. Adjust the Air Shutter. You will need to position the 2. Light appliance- see lighting instructions shutter to provide a gas/air mixture that will achieve on the inside back cover of this manual or the best flame picture with your particular installation.
  • Page 19: Gas Pressure

    139495_Rev_C GF 300 DV IPI 9/11/12 Gas Pressure High Altitude Adjustment Correct gas pressure is essential for efficient and The decreased atmospheric pressure of higher alti- safe operation of the GF 300 DV IPI gas stove. It is tudes affects heat value of gaseous fuels. Most gas important that the correct pressure is established suppliers derate the gas intended for use at eleva- at the time of the installation. Proper gas pressure tions above 2000 feet. Check with your gas supplier provides a consistent flow of gas to the appliance and before performing derate adjustment to the burner.
  • Page 20: Optional Brick Panel Installation

    139495_Rev_C GF 300 DV IPI 9/11/12 CAUTION! THE BRICK PANELS ARE FRAGILE. SUPPORT THE PANELS WITH BOTH HANDS AND HANDLE WITH CARE. Upper Panel 224928 Burner Skirt Left Panel Right Panel 224929 224930 Figure 32. Install the Lower Rear Panel. Lower Panel 224927 Figure 31 Panel kit components. NOTE: BE SURE TO INSTALL THE PROPER BURNER SKIRT Retainer Tab EXTENSIONS OR AIR GUIDES BEFORE INSTALLING THE BRICK PANELS. 1. Install the Lower Panel. Position it up against the back wall, resting on the burner skirt.
  • Page 21: Log Set Installation

    139495_Rev_C GF 300 DV IPI 9/11/12 Log Set Installation Brick Kit Note: Install the optional Reversable Panel Kit 157458 before installing the log set. See page 20 or the instructions provided with that kit. The GF 300 DV IPI log set must be installed before operating the burner. The log set includes six log pieces, packaged inside the firebox. A quantity of ember stones is with the log set. Place the parts inside the firebox as illustrated in figs. 35-39. WEAR GLOVES AND HANDLE THE LOG PARTS CAREFULLY. #157445 Log Set Identification #1 Rear 224962 Figure 35. Locate the Rear Log over the two pins on the #2 Left Front 224963 back shelf of the burner skirt.
  • Page 22: Optional Wall Thermostat

    139495_Rev_C GF 300 DV IPI 9/11/12 Optional Wall Thermostat Use only a 750 millivolt DC two-wire circuit wall thermostat with this appliance. The thermostat should be placed in the same room as the heater, typically 5 feet off the floor. Avoid drafty areas or any area that may affect the accuracy of the thermostat. The thermostat should be connected to the GF 300 DV IPI using a minimum of 16 gauge wire with a maximum length of 25 feet of wire. Connect the two thermostat wire leads to the terminals on the block located to the left of the valve. Do not overtighten the connections. IT IS NOT NECESSARY TO DISCONNECT ANY OTHER WIRES. See Fig. 41.
  • Page 23: System Check

    139495_Rev_C GF 300 DV IPI 9/11/12 System Check 1. PURGING THE GAS LINE: When lighting the appliance for the first time, it will take a few moments to clear the gas line of air. Once this purge is complete, the appliance will operate as described in the lighting instructions. From a cold start, it may be helpful to let the pilot light burn in CPI mode for 10 - 15 minutes to establish positive draft, before turning the burner on. See the procedure on the inside back cover of this manual. Subsequent burner starts will not require purging the gas line unless the supply line is shut off. 2. PILOT FLAME: You can monitor the pilot flame located under the Rear Log. See fig. 40. The pilot flame should be steady - not lifting or floating. The flame should...
  • Page 24 139495_Rev_C GF 300 DV IPI 9/11/12 Flame Appearance / Air Shutter Adjustment The GF 300 DV IPI gas stove is shipped from the factory equipped to burn Natural gas. If the stove has been converted for use with propane, the Air Shutter adjustment range should be limited using the stop screw supplied with the conversion kit. For natural gas, the Air Shutter may be adjusted to provide the best flame picture for your specific installation. Other installation related variables can also affect the flame picture. Too large an air opening - the appliance will generate a flame that is blue and transparent, or an “anemic” flame. Figure 44. Normal flame picture. Too small an air setting - the appliance will generate very long yellow flames resulting in soot.
  • Page 25: Manual Operation

    139495_Rev_C GF 300 DV IPI 9/11/12 Manual Operation Familiarize yourself with the controls of the GF 300 DV WARNING: IPI and be sure that anyone else using the appliance is READ AND UNDERSTAND ALL OPERATING also familiar with the controls and operation procedures. INSTRUCTIONS BEFORE ATTEMPTING TO OPERATE Always follow the Lighting Instructions on the inside back THIS APPLIANCE. DO NOT ALLOW ANYONE TO cover of this manual and also located on the back of the OPERATE THIS APPLIANCE WHO HAS NOT READ Controls Access Panel.
  • Page 26: Maintenance

    139495_Rev_C GF 300 DV IPI 9/11/12 Maintenance FOR REPLACEMENT, USE ONLY JØTUL CERAMIC GLASS KIT 155599. DO NOT USE ANY OTHER TYPE OF GLASS WITH THIS APPLIANCE. Glass Panel or Gasket Removal Your Jøtul GF 300 DV IPI Allagash components and its venting system should be inspected before use and at 1. Lift the Top Plate off of the stove. least annually by a qualified service technician. 2. Release the two Glass Frame Latches. Pull each latch IMPORTANT: ALWAYS TURN OFF THE GAS SUPPLY AND handle forward forward to disengage the latch from DISCONNECT POWER FROM THE APPLIANCE BEFORE ANY the notches in the glass frame.
  • Page 27: Flame Control

    139495_Rev_C GF 300 DV IPI 9/11/12 Accessories Accent Lamp Contents: Tools Required: Premium Upgrade Kits 1. Lamp Box Assembly w/ harness • 10 mm wrench 2. Lens • Safety goggles #157498 - NG 3. Gasket • Work gloves #157499 - LP 4. Light Deflector Plate Kit Contents: 1. Remove the stove top plate. • Flame Control (LP or NG) • Accent Lamp Kit 2. Remove the two flanged hex head bolts (A), nuts (B) • Blower Kit with Multifunction Remote and cover plate from the Relief Panel using a 10 mm socket or wrench. See fig. 49. READ THESE INSTRUCTIONS BEFORE BEGINNING THE 3. Position the Gasket, Lens, and Lamp Box on the top INSTALLATION. SEE PAGES 29-32 FOR REMOTE CONTROL of the Relief Panel using the two bolts (A) previously OPERATION. removed.
  • Page 28: Blower & Multifunction Remote

    139495_Rev_C GF 300 DV IPI 9/11/12 Variable Speed Blower Contents Tools Required 1. Blower • 10 mm wrench This blower must be electrically grounded in  2. Mounting Bracket • Safety goggles accordance with local codes or, in the absence 3. IFC wire harness • Work gloves of local codes, with the current ANSI/NFPA 70, 4. M6 x 12 hex head flange bolts, 2 National Electrical Code or CSA C22.1-Canadian 5. M6 x 12 wing screw 6. Wire tie Electrical Code. Be certain the blower motor is securely fastened 1. Disconnect the power supply from the stove. to the mounting frame on the stove. 2. Orient the Blower Bracket (fig. 50, #2) as shown and Always disconnect the power supply to the stove  securely attach it to the stove using the two M6 before performing any service on the blower.
  • Page 29: Remote Operation

    139495_Rev_C GF 300 DV IPI 9/11/12 Proflame 2 Pilot Assembly Remote Control The pilot contains a pilot hood, igniter, and a flame sensor. The igniter sends a spark to the pilot hood which lights the gas. The sensor is then engulfed by the pilot Features Overview flame, flame rectification occurs and the unit remains lit. If rectification does not occur, the main burner will not light, and the pilot will shut down. The Proflame 2 Integrated Fireplace Control (IFC) incorporates electronic remote control of the Jøtul GF 300 DV IPI features. It is configured to control the on/ WARNING:...
  • Page 30: Control Functions

    139495_Rev_C GF 300 DV IPI 9/11/12 Control Functions Initializing the System 1. P ress the Controls Access Door to release its magnetic Pilot Mode catch and swing the panel down. Switch the Burner to OFF. See fig. 45, pg. 25. Set the stove switch to CPI mode for Proflame 2 remote control. The IPI/CPI functionality will be 2. Install three AAA batteries into the Transmitter. controlled by the remote transmitter. 3. Press the black (or red) button on the right front corner Burner Control of the IFC board, just behind the stove switch plate. The board will “beep” three times and a yellow LED Set the stove burner switch to ON for Proflame 2 indicates a 10-second synchronization time limit. remote control. 4. Within the 10-second time frame, push the ON button OFF - Turns off both remote and manual burner on the Transmitter. The IFC will “beep” four times to functionality.
  • Page 31 139495_Rev_C GF 300 DV IPI 9/11/12 Remote Transmitter Controls Temperature Indication Display With the transmitter in the OFF position, press the  Thermostat Key and the Mode Key at the same time. The display screen will show the current room temperature cycling between Fahrenheit and Celsius indicators each time the keys are pressed Figure 53. Room temperature readings simultaneously. See fig. 53. Pilot Mode With the transmitter in the OFF position, press the  transmitter Mode key - IPI is the default mode. Fig.54.
  • Page 32 139495_Rev_C GF 300 DV IPI 9/11/12 Room Thermostat (Transmitter Operation) Room Temperature The Remote Control can operate as a room thermostat. The thermostat can be set to a desired temperature to control the comfort level in a room. To activate this function, press the Thermostat Key. The  display will indicate that the room thermostat is “ON” and the current Set Temperature is now displayed. Fig. 61. Set Temperature To adjust the Set Temperature, press the Up or Down  Figure 61. Thermostat ON. Arrow Keys until the desired Set Temperature is dis- Figure 62.
  • Page 33: Wiring Diagram

    139495_Rev_C GF 300 DV IPI 9/11/12 SIT Proflame 2 IFC Optional Proflame 2 Stepper Regulator Wiring Diagram Electrode Flame Sensor CPI / IPI Switch SIT Proflame 885 Valve Battery Pack Four, 1.5v AA Burner Switch Main IFC Harness Optional SIT Proflame 2 IFC Variable Lamp 120VAC Power Optional Variable Speed Blower Figure 71. GF 300 DV IPI Allagash with Proflame 2 Premium Remote Control Accessories IFC Battery Replacement A red LED on the IFC board indicates low battery power.
  • Page 34: Illustrated Parts Lists

    139495_Rev_C GF 300 DV IPI 9/11/12 GF 300 DV IPI Allagash Illustrated Parts Breakdown Figure 72. GF 300 DV IPI Cast iron parts and associated hardware. Green Blue Black Ivory Brown Cast Iron Parts Matte Black Enamel Enamel Majolica Majolica Enamel Enamel 1. Top Plate 10463192 10463127 10463129 10463147 10463149...
  • Page 35 139495_Rev_C GF 300 DV IPI 9/11/12 YEL/GRN Figure 73. GF 300 DV IPI Valve Assembly and IFC Components. No. Part No. Description No. Part No. Description 117917 Screw, #8 x 1/2” SL Blk Oxide 14. 22477092 Control Bracket 224904 Valve Bracket 15. 117975 Wing Nut, M6 Zinc 118214 Screw, #8x 1/4” Taptite 16. 224145 Magnetic Catch - Push to open 222292 Elbow, 90° Brass 3/8 NTP x 3/8” Dia.
  • Page 36 139495_Rev_C GF 300 DV IPI 9/11/12 Figure 74. GF 300 DV IPI Pilot & Burner assembly and associated hardware. Part No. Description No. Part No. Description 14. 224909 Gasket, Burner Venturi, Steel Burner 117917 Screw 8 x 12 1/2 SL Blk Oxide 15. 225338 Venturi Tube Weldment 2. 22495092 Air Deflector, Max Vent, Rear 16. 117968 Nut, M6 Serrated Flange plain 3. 22494992 Air Deflector, Max Vent, Side 17. 220946 Orifice, #40 / NG 4. 22494892 Air Deflector, Min Vent, Rear 129804 Orifice, 1.40mm / LP 5. 22494692 Air Deflector, Min Vent, Side 223231 Orifice Holder, 12.5” Tube 6. 22475192 Burner Skirt...
  • Page 37: Accessory Listing

    139495_Rev_C GF 300 DV IPI 9/11/12 Figure 76. Figure 75. GF 300 DV IPI Glass Assembly GF 300 DV IPI Accent Lamp Assembly GF 300 DV IPI Accessories No. Part No. Description Description Part No. 117967 Screw, Pan Head #7 x 3/8 PH Zinc Premium Upgrade Kit / NG* 157498 157601 Replacement Lamp Wire Harness Premium Upgrade Kit / LP* 157499 3. 2 22943 Light Bulb, 130 Volt, 50 Watt Wall Thermostat 750003...
  • Page 38: Warranty Statement

    139495_Rev_C GF 300 DV IPI 9/11/12 Jøtul Gas Product 2) Damage due to incorrect installations not in conformance with the installation instructions contained in this owner’s manual or local and/or national fire and building regulations. Limited Warranty 3) Damage due to service performed by an installer, service agency or gas supplier, unless otherwise agreed to in writing by JØTUL. 4) Labor or other costs associated with the repair of gas controls, plumbing, burners, log set, or sheet metal firebox beyond the warranty This warranty policy applies to gas products identified period. by Jøtul, Scan, and Atra trade names, as set forth below. 5) Damage caused by unauthorized modification, use or repair. 6) Damage to enameled surfaces caused by improper operation or A. Cast Iron, Steel Doors, Surround Components, Firebox: misuse, including use that is not in conformance with the operating Jøtul North America Inc. (JØTUL) warrants, to the original instructions contained in this owner’s manual. Such damage can typically retail purchaser, that those components of the Jøtul, Scan, be identified by bubbling, cracking, or discoloration of the enamel finish.
  • Page 39: Lighting Instructions

    139495_Rev_C GF 300 DV IPI 9/11/12 LIGHTING INSTRUCTIONS FOR YOUR SAFETY, READ BEFORE LIGHTING. WARNING: IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTLY, A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY, OR LOSS OF LIFE. A. This appliance is equipped with an ignition device •...
  • Page 40 139495_Rev_C GF 300 DV IPI 9/11/12 This appliance must be installed in conformance with local and national building regulations. Before beginning the installation, it is important that the these instructions be carefully read and understood. Jøtul maintains a policy of continual product development. Consequently, products may differ in speci- fication, color or type of accessories from those illustrated or described in various publications. Jøtul vise sans cesse a ameliorer ses produits. C’est pourquoi, il se reserve le droit de modifier les specifi- cations, couleurs etequipement sans avis prelable. Jøtul ASA P.O. Box 1411 N-1602 Fredrikstad Norway Jøtul North America 55 Hutcherson Dr. Gorham, Maine 04038-2634...

Table of Contents