Wiring; General Wiring - Furuno NAVpilot-700 Installation Manual

Autopilot
Hide thumbs Also See for NAVpilot-700:
Table of Contents

Advertisement

2. WIRING

2.1

General Wiring

All units are connected to the Processor Unit. Separate the cables as far as possible from
the cables that transmit radio frequency or pulsed signals. At least one meter separation
is recommended.
PROCESSOR UNIT
FAP-7002
Power supply
12-24 VDC
Solenoid valve
Reversible pump
Hydraulic
linear drive
NMEA PORT1 (Nav equip.)
NMEA PORT2 (Nav equip.)
CANbus (FI-50, PG-700, etc.)
1
*
: Attach the terminator to the empty
connector of the last control unit in the series.
2
*
: Not required for Fantum Feedback
BD-07AFFM-LR-150
Remote
PC
Controller
or
Distributor
Remote
Controller
or
Distributor
TM
.
Terminator BD-07AFFM-LR7001*
(supplied)
BD-07AF-07AF-LR-100
BD-07AF-07AF-LR-100
CONTROL UNIT
FAP-7001/7011
RUDDER
REFERENCE
UNIT
2
FAP-6112*
Contact signal out
Contact signal in
1
or
CONTROL
UNIT
FAP-7021
or
Terminator
BD-07AFFM-LR7001*
(supplied)
1
2-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Navpilot-711Navpilot-720

Table of Contents