Assembly Instructions; Dealer Set-Up Instructions - Woods Batwing BW240 Operator's Manual

Hide thumbs Also See for Batwing BW240:
Table of Contents

Advertisement

DEALER SET-UP INSTRUCTIONS

Assembly of this cutter is the responsibility of the
WOODS dealer. It should be delivered to the owner
completely assembled, lubricated and adjusted for nor-
mal cutting conditions.
The cutter is shipped partially assembled. Assembly
will be easier if components are aligned and loosely
assembled before tightening hardware. Recommended
torque values for hardware are located on page 72.
Select a suitable working area. A smooth hard surface,
such as concrete, will make assembly much quicker.
Open parts boxes and lay out parts and hardware to
make location easy. Refer to illustrations, accompany-
ing text, parts lists and exploded view drawings.
Complete the check list on page 44 when assembly is
complete and cutter is delivered to the customer.
 Before working underneath, carefully read Oper-
ator's Manual instructions, disconnect driveline,
raise mower, securely block up all corners with
jackstands, and check stability. Secure blocking
prevents equipment from dropping due to hydrau-
lic leak down, hydraulic system failures, or
mechanical component failures.
 Do not disconnect hydraulic lines until machine
is securely blocked or placed in lowest position
and system pressure is released by operating
valve levers.
CAUTION
 Always wear relatively tight and belted clothing
to avoid entanglement in moving parts. Wear
sturdy, rough-soled work shoes and protective
equipment for eyes, hair, hands, hearing, and head;
and respirator or filter mask where appropriate.
CENTER SECTION ASSEMBLY
Install Hydraulic Hoses
1. Insert one 264 inch (wing cylinder) hose and one
230 inch (center cylinder) hose into the right tube in
the center section. Insert one 264 inch hose into
the left tube.
2. Extend the 264" hoses approximately 52 inches
past the back of the center section. Extend the
230" hose approximately 22 inches past the back
of the center section.
MAN0725 (10/3/2008)

ASSEMBLY INSTRUCTIONS

ARNING
3. Secure hose to center section using hose clamps
(12), carriage bolts (59) and lock nuts (32). Clamps
are used at the both front and at the rear of the
deck.
4. Do not tighten clamps at this time. Hoses lengths
may need to be adjusted once assembly is
complete.
12. Feedline clamp
32. 5/16 NC Lock nut
59. 5/16 NC x 1 HHCS GR5
29
32
Figure 24. Hoses Clamped to Deck, Rear Right Side
Install Attitude Rods
4. Attitude rod
21. 1" Spacer
29. 1" Hex nut
33. 1" Flat washer
Figure 25. Attitude Rods Attached to Wheel Yoke
1. Insert attitude rods (4) through front of center
section frame, out the center of the deck and
through pivot casting in wheel yoke arm assembly.
The rod is a very tight fit; use care to prevent
thread damage during installation.
2. Slide spacers (21) over rods and install washers
(33) and two nuts (34) per rod.
Assembly 33
12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Batwing bw240q

Table of Contents