Follow Steps 1 through 4 on page 13, then continue PBD-1200A horiztantal ducting installation by following the
steps below.
5. Knock out plate A for dual blower horizontal
ducting.
7. Attach top cover plate to top of hood body using
A
6. Position dual blower inside hood body. Attach by
8. Attach 10 inch round blower collar to back of
wire extension cable to new blower and connect
both plugs from each blower to female plugs
behind switch panel.
14
www.zephyronline.com
Need help?
Do you have a question about the AK7500BS and is the answer not in the manual?