Verifying The Installation - H3C S5100-SI Series Installation Manual

Hide thumbs Also See for H3C S5100-SI Series:
Table of Contents

Advertisement

Installation Manual
H3C S5100-SI/EI Series Ethernet Switches
Caution:
The dedicated stack cables for the S5100-EI series are hot-swappable.
When tightening the fastening screws at both sides of the stack cable plugs using a
flathead screwdriver or an electric screwdriver, make sure that the torque is not
bigger than 0.4N•m.
When connecting a stack cable, make sure that the bending radius of cable is at
least eight times of the cable diameter.

3.9 Verifying the Installation

After completing the installation, verify that:
The correct power source is used.
The ground wire is securely connected.
Both of the console cable and power cord are correctly connected.
All the interface cables are routed indoors. If there are cables outdoors, check that
the socket strip with lightning protection and lightning arresters for network ports
have been correctly connected.
3-29
Chapter 3 Installing the Switch

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents