Operation; Maintenance - ProMinent Makro TZ Operating Instructions Manual

Metering pumps
Table of Contents

Advertisement

Commissioning / Operation / Maintenance
Page 26
IMPORTANT with regard to ball valve installation (single ball valve with Teflon ball seat only)
If experiencing priming problems during installation:
Ensure that there are no foreign bodies in the valve
Place valve on a stable surface
Tap the ball seat lightly with an approx. 300 g hammer and a brass rod
Allow valves to prime while wet. The pump is now ready for operation.
approx. 300 g
Brass rod
Fig. 15
The pump is now ready for operation.
9

Operation

WARNING
EX pump only: Always observe the "Important supplements for dosing pumps in EX areas"
section of the "General Operating Instruction for ProMinent
and Hydraulic Accessories"!
NOTICE
• Note the instructions in the "Commissioning" section and in the operating manuals for
the other machine components.
• HMH only: If hydraulic oil is not flowing through the hose to the bleed valve, stop the
pump immediately and contact customer service.
The liquid end may otherwise be seriously damaged.
10

Maintenance

WARNING
• EX pump only: Always observe the "Important supplements for dosing pumps in
EX areas" section of the "General Operating Instruction for ProMinent
Metering Pumps and Hydraulic Accessories"!
• Always depressurise the suction and discharge lines before working on the pump!
• Always empty and rinse the liquid end before maintenance or repair work if the pump
has been used with unknown or hazardous media.
®
Motor-Driven Metering Pumps
®
Motor-Driven
ProMinent
®

Advertisement

Table of Contents
loading

This manual is also suitable for:

Makro tzmbMakro tzmaMakro tzhaMakro tzka

Table of Contents