Power Supply Installation - Antec Nineteen Hundred User Manual

Pc
Table of Contents

Advertisement

3. Preparing the KUHLER H
H
O installation guide, available at
2
http://www.antec.com/Believe_it/product.php?id=Mjc2OCYxNw== (KUHLER H
http://www.antec.com/Believe_it/product.php?id=NzA0MzcwJjE3 (KUHLER H
information.
4. Prepare the retention ring according to the CPU socket you're using.
5. Complete installation according to the KUHLER H
2.4

Power Supply Installation

1. With the case upright, place the power supply as illustrated in the image to the right.
2. Push the power supply to the back of the case and align the mounting holes.
3. Attach the power supply to the case with the screws provided.
12
O backplate is specific to your CPU socket. Please refer to the KUHLER
2
O instructions.
2
Attach the power supply with the provided screws.
O 620) or
2
O 920) for more
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents