FULTON ICW6 - 60 HP Installation And Operation Manual page 34

Vertical tubeless design gas/oil-fired hot water boilers
Table of Contents

Advertisement

MAINTENANCE
4
CAUTION
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
All maintenance procedures should
be completed by trained personnel.
Appropriate training and instructions
are available from the Fulton Service
Department at (315) 298-5121 or your
local Fulton Thermal Representative.
In order to meet warranty conditions,
ensure all appropriate maintenance
activities are performed.
4-4
6. Fit the hand hole assembly as follows:
» Place the gasket on the hand hole plate and ensure that it is
seating correctly. Do not use any grease, lubricant, or adhesive.
» Position the plate in the boiler. Set the yoke and tighten the
securing nut su ciently enough to provide a snug t. Verify
the position of the plate in the boiler, then make it hand tight
and then snug with wrench about 1/4 turn. Do not compress
excessively. See Figures 6 and 7.
» Re ll the boiler with fresh water.
FIGURE 6 CORRECT PRESSURE ON GASKET
FIGURE 7 OVER COMPRESSED GASKET
SECTION 4
ICW-IOM-2012-1001
© The Fulton Companies 2012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Icw6Icw10Icw30Icw50Icw15Icw60 ... Show all

Table of Contents