Schwank STS-JZ Installation & Owner's Manual page 18

Low intensity tube type infrared heaters
Table of Contents

Advertisement

STS-JZ-F / IQ-F I&O Manual
IM101220
RD: MAY 2014
RL: 17A
#6
After installation of the elbow assembly,
fasten the corners of the reflector cover
with the 2 screws provided.
For 90° installation finish with step # 7
For 180° installation skip # 7 and proceed
to step # 8
#7
Suspending the elbow kit in horizontal
position prepared for tube installation in
horizontal mode.
#8
180° ELBOW KIT ASSEMBLY
Add the second coupler to the 90° elbow
kit to form 180° elbow kit
Slacken the bolts and slide the coupler
over the elbow at the swaged end.
#9
Add the third plate hanger to the elbow kit
– pay attention to the mouting position of
the plate. Always with the cavity facing
toward the 'burner end' of the system
#10
Place the second reflector over the plate
hangers. Secure the reflector with 8
screws to the plate hanger.
18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iq

Table of Contents