MHG Heating ProCon HT Installation And Operating Manual page 11

Floor standing condensing boiler range
Table of Contents

Advertisement

5. (5)Swing the Control Panel to the right
(6) Slide panel A to the right and remove.
7. (8) Lift the top panel up, (8) push to the rear
of the unit and remove.
MHG Heating Ltd, Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR
P:0845 6448802 F:0845 6448803 E:
© MHG Heating Ltd
6. (5) Swing the control panel back
into its rest position, (7) slid panel
B up and remove.
8. (9) Pull the base of each side
panel to disengage it from the
press studs, (9) lift the panel
clear of the top pins.
info@mhgheating.co.uk
011011
W: www.mhgheating.co.uk
11

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ProCon HT and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Htp 150Htp 225Procon ht 150Procon ht 225

Table of Contents